Skip to content
CargoNetPOLSKA
Free quoteQuote
Sourcing • Quality control • EU compliance

Importing power generators from China — from the factory to an EU-compliant product

A generator is not an ordinary product: the engine, emissions and documentation decide whether it can be placed on the market. We run the import end to end — factory selection, quality control, transport, customs, and full CE and Stage V compliance.

Free quote within 24 h

Why generators are an import for the experienced

A container of generators that can't be legally sold in the EU is the most expensive container in a company's history. Generators are where a costly mistake is easiest: an engine without Stage V type-approval, a missing declaration of conformity, the wrong tariff code, or no noise-level marking. We've been importing power generators from China for over a decade — for our own sales and for B2B clients — and we know where the pitfalls are.

What our service covers

Duty, VAT and tariff codes

Generating sets are classified under CN heading 8502. The duty rate on imports from China is normally 2.7%, and import VAT is 23% on the value of the goods plus freight and duty.

CN codeRangeDuty
8502 11diesel-engine generators up to 75 kVA2.7%
8502 12diesel-engine generators 75–375 kVA2.7%
8502 13diesel-engine generators above 375 kVA2.7%
8502 20petrol (spark-ignition) engine generators2.7%

The right code depends on the engine type and power — at the quote stage we confirm the classification and calculate the full landed cost, so nothing surprises you at customs.

Standards you must comply with

Exhaust emissions — Stage V

Portable and mobile generators with a combustion engine fall under Regulation 2016/1628 (Stage V) and must be fitted with an engine holding the relevant type-approval. Some stationary generators are exempt from this requirement. It's the first thing we check with the manufacturer — because swapping the engine after the fact is impossible.

CE marking

A generator is subject to New Approach directives (Machinery, EMC, Low Voltage and others). The basis for CE marking is an EU declaration of conformity together with the technical file and an operating manual in Polish.

Noise — Directive 2000/14/EC

Generators intended for outdoor use require marking of the guaranteed sound power level (LWA) and the appropriate conformity assessment procedure.

Product safety — GPSR

For sales to consumers, the General Product Safety Regulation (GPSR) applies. We make sure the labelling, warnings and manufacturer/importer details are complete.

Diesel, petrol or inverter — we'll match it to the use case

A 20–100 kVA construction generator has different requirements than a portable inverter generator up to 3 kW for e-commerce sales. We help choose the type, power and features (AVR, ATS, soundproof canopy) for the intended use and sales channel — including under the OEM and private-label model.

More than a one-off import — we build distribution

We don't stop at a single container. We help you move from a one-off import to steady, high-margin distribution: your own generator brand made in China, repeatable quality, warehousing and B2B plus e-commerce sales. CargoNet Polska is steadily building its position as one of the leading importers and distributors of power generators in Poland — if you're serious about this market, we're the partner that walks the whole way with you: from the idea, through the factory, to the end customer.

And most importantly — the category on an exclusive basis. When we run the generator import for you, we handle that category for you exclusively: we do not source the same goods for your competitors. It's loyalty and a long-term relationship, not brokerage — you're working with a partner who is on your side.

Frequently asked questions

What is the duty on power generators from China?

For generating sets (CN codes under heading 8502) the duty rate is normally 2.7%. On top of that, import VAT of 23% on the value of the goods including freight and duty. At the quote stage we identify the correct CN code and calculate the full landed cost.

Does a generator from China have to meet the Stage V standard?

Portable and mobile generators with a combustion engine fall under Stage V (Reg. 2016/1628) and require a type-approved engine. Some stationary generators are exempt. We check the engine's status before ordering.

Is CE marking required?

Yes — an EU declaration of conformity and CE marking (Machinery, EMC, LVD directives), and for outdoor use also noise marking under 2000/14/EC. We take care of the full documentation set and the Polish-language manual.

How long does delivery of generators from China take?

By FCL sea freight usually 35–45 days, by rail about 18–25 days — plus production and quality-control time. At the quote stage we give a realistic date.

See also: container transport from China and sourcing and manufacturer vetting in Asia.

Let's cost out your generator import

Tell us the type, power and quantity — within 24 hours you'll get an itemised quote and an EU-compliance assessment.

Send inquiry   Call: +48 502 406 787